Skip to content
This repository has been archived by the owner on Sep 19, 2024. It is now read-only.

18-009-AR Change Downed Aircrew Pickup Point to Isolated Personnel Recovery Site #506

Open
joebayles opened this issue Aug 20, 2018 · 0 comments

Comments

@joebayles
Copy link
Collaborator

STATEMENT OF THE PROBLEM: The U.S. Army cannot construct an Isolated Personnel Recovery Site Control Measure. The U.S. Army (and Services) has been using the “Downed Aircrew Pick-Up Point symbol” (Symbol Set Code: 25, Code 180300) to attempt to depict this control measure, but it doesn’t adequately portray the information needed. The U.S. Army needs a symbol that can portray an Isolated Personnel Recovery Site for 1 or more individuals, or a group of individuals.

This identified military symbol gap is currently not permitting the U.S. Army to properly differentiate “Isolated Personnel Recovery Site” from a “Downed Aircrew Pick-Up Point”. Not being able to differentiate this unique action from a “Downed Aircrew Pick-Up Point” can cause confusion when creating doctrine organization structures, course of action sketches, overlays, or a common operation picture.

PROPOSED SOLUTION: Change the name of Symbol Set Code: 25, Code 180300 “Downed Aircrew Pick-Up Point” to “Isolated Personnel Recovery Site”, add an additional information field (H), and a DTG field (W-W2) to effectively identify the number of individuals and time of recovery. This will make this symbol more generic and allow more flexibility in its usage.

image

image

Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.
Projects
None yet
Development

No branches or pull requests

1 participant