Scheduled - upgrade #498
integration-on-schedule-upgrade.yml
on: schedule
Start integration test (upgrade)
/
Preprocess input variables
0s
Start integration test (upgrade)
/
Preprocess input variables for linode
9s
Matrix: Start integration test (upgrade) / Run integration test on linode cluster
Annotations
4 errors and 2 warnings
Start integration test (upgrade) / Run integration test on linode cluster (1.31)
The job running on runner GitHub Actions 222 has exceeded the maximum execution time of 360 minutes.
|
Start integration test (upgrade) / Run integration test on linode cluster (1.31)
Process completed with exit code 1.
|
Start integration test (upgrade) / Run integration test on linode cluster (1.31)
Process completed with exit code 2.
|
Start integration test (upgrade) / Run integration test on linode cluster (1.31)
The operation was canceled.
|
Start integration test (upgrade) / Preprocess input variables
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Start integration test (upgrade) / Preprocess input variables for linode
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|