New Focus ethernet controller (model 8752) for beam-pointing picomotors
Serial Ports on Main Control PC
Port
Device
COM1
Sample x,y,z translation stages (on backend serial port)
COM6
Shutter 1 (blue, on P1)
COM8
Time delay translation stage (on P5)
COM9
RS40 rotation stage (on separate serial-to-USB converter)
COM10
Shutter 2 (red, on P2)
COM12
Shutter 3 (yellow, on P4)
COM18
Electrometer (on P6)
COM25
High voltage power supply (on P3)
2. Startup Guide
2.1 Laser System
Switch on chillers.
Switch on the main power bar and refrigeration of chiller (Neslab RTE-100) for REGEN Pockels cell.
Switch on the chiller (Neslab Merlin M25) for REGEN pump laser.
Check the REGEN chiller water temperature setting (20 C).
Check the Micra chiller status (21 C).
Check the CCD camera chiller status (20 C).
Check that the water flow rate of the REGEN pockels chiller is about 2.5 gal/min.
Check that the water flow rate of the REGEN pump laser chiller is about 10 gal/hr.
Switch on oscillator.
Turn the key (from standby to on) of Micra power supply controller (PSC).
Open Micra shutter using Micra PSC.
Wait about 5 min.
Check for Micra power ~200 mW and Verdi power ~ 4.5 mW on PSC indicator.
Enable automodelocking on Micra PSC by pressing Menu Select 3 times.
Return to original status screen of Micra PSC by pressing menu exit 2 times.
Wait about 1 min.
Check for automodelocked status on Micra PSC indicator.
Expect Micra power to be about 290 mW.
Wake up the Micra Synchro-Lock laptop by pressing its power button.
Press Go Left or Go Right in stepper motor controls to reduce frequency difference.
Make sure that Galvo voltage is about 0 V and P/D Det Slave is greater than 1.0.
Enable fundamental and harmonic frequency lock by selecting fund. enable and harm. enable in Coherent Synchro-Lock program interface; if unable to lock, modify value of Loop Gain.
Switch on ND:YLF pump laser.
Switch on power of IntraAction Q-switch driver using back panel push button.
Switch on power of Xantrex power supply of Regen pump laser.
Set output of Xantrex power supply to 15.3 V and 16.2 A; adjust both voltage and current dials whichever is limiting.
Switch on and control the REGEN.
Switch on power of oscilloscope positioned over REGEN.
Slide on power switch of photodiode monitoring REGEN output power.
Switch on power and HV on Regen controller (Clark-MXR DT-505).
Turn shutter key of REGEN to on position.
Optimize overlap for amplification step by looking at oscilloscope (3 pulses and 4th is coupled out); aim for it to look like entering saturation but not more.
Adjust exit mirror of ND:YLF pump laser to optimize laser output by maximizing 3rd pulse to be slightly less than the 4th pulse on the oscilloscope; rotate oscilloscope 180 deg for convenience.
Adjust exit mirror of oscillator (input into stretcher) to further optimize laser output.
Measure laser output power.
Use the power meter(Coherent PowerMax, head PM10) to measure output laser power of the compressor (~52 mW at 100 Hz in the current conditions); ensure that power meter is always charged.
Write down Micra power, REGEN pump current, and output power in notebook.
Turn on control software.
On the Server computer (Talisker): start the beam-pointing camera servers (PGRFlyCapServer_cam0/1.exe) in the laser monitor directory.
On the beam control computer (Oban): start beam-pointing Matlab program FindBeamWidthInImages.m in the C:/BeamMonitor directory; click Grab Image; Load Settings, and Grab Image again; set MaxMove threshold to 1000; enable Restore H and Restore V; check measured beam position if restored to reference; set MaxMove threshold back to 100; click Start Automatic Grabbing; enable Auto H and Auto V; if cameras or mirrors are moved, click AutoCalibrateMatrix and wait about 5 min for re-calibration.
2.2 Venting Procedure of the Sample Chamber
Properly shut off HV power supply, RF compression system, and CCD camera.
Close completely the isolation gate valve of the electron gun.
Close the roughing pump valve which is located on top of the sample chamber.
Press the power button of the turbopump controller to put the turbopump in standby mode.
Check actual rotation speed by using the arrow buttons of the turbopump controller and switching to the act rotspd channel (309) .
Wait about 10 min for turbopump rotation speed to drop from 1000 Hz to 0 Hz.
Make sure N₂ cylinder valves are all closed.
Use controller arrow buttons to switch to vent mode channel (030).
Press both arrow buttons simultaneously to change vent mode from 1 (vent valve closed) to 2 (vent valve open).
Open the valves of the N₂ cylinder.
Open slowly regulator valve until air flow reaches about 5 psi.
Use a torque wrench to remove some of the screws of the main access flange; expect to hear a hiss caused by positive chamber pressure.
Close the valves of the N₂ cylinder.
Change turbopump vent mode from 2 back to 1.
Remove remaining screws of main flange.
2.3 Venting Procedure of the Electron Gun Chamber
Properly shut off HV power supply, RF compression system, and CCD camera.
Close completely the isolation gate valve of the electron gun.
Close the roughing pump valve which is located on top of the sample chamber.
Close the valve of the gun chamber roughing pump located below the gun chamber turbopump by turning the knob until the solid line is horizontal.
Press the power button of the sample chamber turbopump controller to put the sample chamber turbopump in standby mode.
Press the power button of the gun chamber turbopump controller to put the gun chamber turbopump in standby mode.
Wait about 20 min for the rotation speed of both turbopumps rotation to drop to 0 Hz.
Wait for both chamber pressures to be between 10⁻³ and 10⁻² mbar.
Open completely the isolation gate valve of the electron gun.
Wait for the pressure between both chambers to be equalize.
2.4 Pump-Down Procedure of the Sample Chamber
Clean the knife edge of the main access flange and the new copper gasket with solvent.
Install gasket-flange onto sample chamber.
Install screws in their numerical order.
Hand-tighten the screws.
Check turbopump vent mode to be 1.
Open slowly roughing pump valve; expect throttling noise from pump.
Wait 15 mins for sample chamber pressure to be about 10 mbar.
Switch on the power of the sample chamber turbopump.
Check if the chamber pressure drops below 10⁻⁴ mbar before turbopump frequency reaches 1 kHz; troubleshoot otherwise.
Wait about 6 hrs for pressure to be less than 10⁻⁷ mbar.
Check turbopump motor current as a measure of the efficiency of the roughing pump; 0.50–0.70 A (sample chamber) or 0.20–0.30 A (electron gun chamber).
2.5 Start-Up Procedure of the Electron Gun
Make sure that the RF voltage is 0 V by turning the RF power dial clockwise fully.
Make sure that the vacuum pressure of the sample chamber is less than 10⁻⁷ mbar.
On the control computer (Lagavulin): Start HV control Matlab program (HVControl.m), directory D:/Matlab.Routines/HVControl/, Set Desired Voltage to 94.1 kV, Enable Allow Arc Control? and Auto Conditioning.
Switch on the power of PLL chiller (IsoTemp 1016S)
Switch on the power of vacuum motors using power bar behind HV power supply
Switch on the power and HV output of HV power supply
On the Server Computer (Talisker), switch on the power of RF cavity chiller (Neslab RTE-7) using ON command on chiller server program (multilogger.bat) or manual press the power button (works only if the chiller is not computer-controlled; the chiller can be switched off using either the computer or the button).
Switch on the power of oscilloscope above PLL.
Switch on the power of RF waveform generator (Agilent 33220A).
Switch on the power of PLL.
Turn the RF attenuator dial clockwise to set RF voltage to 0.
Turn the mains power key of RF amplifier from 0 to 1.
Check that Micra is modelocked.
Press Latch reset button on the RF Interlock and Timing panel to reset the RF interlock.
Turn RF attenuator dial such that the purple output RF waveform matches the purple reference line.
Turn RF OFF latch button to reset RF interlock.
Switch on the power of the CCD camera.
Switch on the power of the magnetic lens power supply.
2.6 Computer control
Start the camera software.
Start the camera software (SI Image SGL).
Select 800-402.set and click OK.
Set camera cooler to ON.
Update date of auto-save directory.
In configuration tab, set Shutter Delay to 10 ms.
Start TCP/IP server in Operate Menu.
Start the motion control program.
Double click and run Motion Control program at D:\Code\Sample.Motion.Control\Experiment_Control.vbp.
Click Connect in the Camera menu.
Select ROI in SI CCD subsection.
Modify the camera ROI settings appropriately (Serial, SLen, Parallel, PLen): small ROI = (950,124,650,200), *medium ROI = (750,324,425,600), large ROI = (500,574,200,1000).
Initialize translation stages.
Click Initialize in the Horizontal (Indexer 1) subsection.
SetOperation Mode to Destination and Reverse (for the horizontal stage) or Down (for the vertical stage); directions of the sample chamber translation stage: Reverse = towards the lab door (negative encoder value, right on screen), Down = towards the lab floor (positive encoder value, up on screen).
Set both Destination values to be 100000.
Click Go.
Wait for motor idle status; make sure that the stages do not hit the chamber walls.
Click Reset to reset the stage encoders to 0.
Click Initialize in the Stage (Indexer 4) subsection.
3. Experimental Procedures
3.1 Check Laser Pulse Compression
Manually open the THG shutter (Uniblitz).
Put the powermeter head after the last mirror.
Disable Avg on the powermeter; press Down to reduce the indicator range.
Rotate the polarizer to maximize photocathode pump power (about 200 uJ).
Turn the control dial of the compressor to further maximize pump power (about 600 uJ); this dial changes the stage position of the compressor grating.
Manually close the THG shutter.
Remove the powermeter head.
3.2 Optimize THG Photocathode Overlap
Change to small ROI using the motion control program.
Enable continuous acquisition in the camera program.
Use the cursor to enclose the electron beam on screen in a red box within the camera program.
Adjust the position of the THG focusing lens to find the local symmetric maximum of the electron image mean value.
3.3 Measure Electron Number
Make sure that camera sensor has not saturated.
Start ElectronBeamCal in the Automation menu of the motion control program.
Uncheck Log result.
Check Track number and Continuous acquire.
In case of error (e.g. Ebeam directory not found), check the date settings in the camera program and restart ElectronBeamCal.
3.4 Check Spatial Overlap of the Pump and Probe Beams
Switch off the output of the magnetic lens power supply.
Go to the pinhole position with the motion control program.
Change to small ROI on the motion control program.
Reduce to minimum pump laser power.
Change exposure time to single shot mode (about 0.005 s at 100 Hz) in the camera program.
Uncheck Background in Image Correction/Autocorrection menu of the camera program.
Uncheck Auto Z-scale in the camera program.
Enable Continuous acquire on the camera program.
Use Displacement mode of the motion control program to get a centered electron beam spot.
Set laser repetition rate to 1 kHz (?).
Open the red and blue shutters using the motion control program.
Align the sample chamber camera, next to the main CCD camera, to get a good view of the pump laser beam spot.
Adjust the lens at the pump laser window to optimize the laser spot brightness.
Close red and blue shutters using the motion control program.
Return the laser repetition rate to the previous setting (?).
To-do: Describe what each channel (A,B, etc.) on the pulse generator (Quantum Composers 9520 Series) means.
4. Maintenance Procedures
Chillers: Water needs to be changed; add anti-algae product. Every 6 months, currently set for February and August.
Big Thermo Fischer chiller: Change filter every 3–4 years, depending on the chiller flow rate (2–3 gal/min).
High voltage power supply: Replace insulating oil every 2 years.
Vacuum pumps: Change oil as needed or whenever the turbopump current is not ok; roughing pumps currently ok.
Laser system: Clean the oscillator if modelocking is off or power is too low; clean the mirrors for the pump light in the REGEN every 2–4 weeks.
Chemicals: Dispose of bin contents whenever full (7th floor of the Lash Miller building).
5. Troubleshooting
Problem
Solution
REGEN output peak selection is suboptimal
Press and check contacts of the delay 3 control dial of Pockels cell controller
Artifacts (checkered streaks) on acquired CCD image
Restart camera controller and maybe the laser system
PP30 stages unresponsive to control program
Restart PP30 power bar
Sample stage unresponsive to control program
'Jiggle' gently the cables of the Parker sample stage controllers
Frequent arcing in the electron gun chamber
Carefully recondition the chamber using a low voltage ramp rate