Triage Process

Triage query (vnext)

For every issue labeled Needs Triage we apply this process:

  1. Is the issue unclear?
  2. Labels
  3. Milestone
    • All intended to be scheduled work should have a milestone. Not assigned to a milestone means low priority backlog.
  4. Project
    • Assign to a project board if appropriate (grouped set of related work)
  5. Assign
    • If someone should look at this immediately, in the next block of work (1-2 weeks), or they have the next action, assign to them
    • Leave unassigned to leave in the general poachable/backlog
  6. Remove Needs Triage label

After processing Needs Triage, move on to Needs: Attention.

Bot Rules