Skip to content

Restructure everything into the bazel-contrib/template structure #2

Restructure everything into the bazel-contrib/template structure

Restructure everything into the bazel-contrib/template structure #2

Triggered via push October 21, 2023 00:04
Status Cancelled
Total duration 2m 11s
Artifacts

ci.yaml

on: push
test  /  matrix-prep-os
3s
test / matrix-prep-os
test  /  matrix-prep-bazelversion
4s
test / matrix-prep-bazelversion
Matrix: test / test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test / test (windows-latest, 6.4.0, ., true)
Canceling since a higher priority waiting request for 'CI-refs/heads/main' exists
test / test (windows-latest, 6.4.0, ., true)
The operation was canceled.
test / test (windows-latest, 6.4.0, e2e/smoke, false)
Canceling since a higher priority waiting request for 'CI-refs/heads/main' exists
test / test (windows-latest, 6.4.0, e2e/smoke, false)
The operation was canceled.
test / test (ubuntu-latest, 6.4.0, ., true)
Canceling since a higher priority waiting request for 'CI-refs/heads/main' exists
test / test (ubuntu-latest, 6.4.0, ., true)
The operation was canceled.
test / test (macos-latest, 6.4.0, ., true)
Canceling since a higher priority waiting request for 'CI-refs/heads/main' exists
test / test (macos-latest, 6.4.0, ., true)
The operation was canceled.