Restructure everything into the bazel-contrib/template structure #8
ci.yaml
on: push
test
1m 40s
integration-tests
23s
Annotations
3 errors
integration-tests
Process completed with exit code 2.
|
test
Canceling since a higher priority waiting request for 'CI-refs/heads/main' exists
|
test
The operation was canceled.
|