Skip to content

ci

ci #1823

Triggered via schedule November 6, 2024 01:29
Status Failure
Total duration 4m 57s
Artifacts

ci.yml

on: schedule
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

1 error and 2 warnings
test (macos, macos-latest, stable)
Process completed with exit code 101.
test (stable-s390x, ubuntu-latest, stable, s390x-unknown-linux-gnu)
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/11bd71901bbe5b1630ceea73d27597364c9af683'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
test (stable-s390x, ubuntu-latest, stable, s390x-unknown-linux-gnu)
Back off 11.69 seconds before retry.