Skip to content

[ISSUE #4667] Fix some connectors have not been included in the packa… #47

[ISSUE #4667] Fix some connectors have not been included in the packa…

[ISSUE #4667] Fix some connectors have not been included in the packa… #47

Triggered via push December 17, 2023 13:50
Status Failure
Total duration 6h 0m 37s
Artifacts

ci.yml

on: push
Matrix: Build
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
Build (ubuntu-latest, 11, go)
Java heap space
Build (ubuntu-latest, 11, java)
Java heap space
Build (macOS-latest, 11, java)
Java heap space
Build (macOS-latest, 11, go)
Java heap space
Build (macOS-latest, 8, java)
GC overhead limit exceeded
Build (macOS-latest, 8, go)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 360 minutes.
Build (macOS-latest, 8, go)
The operation was canceled.
License Check
Restore cache failed: Some specified paths were not resolved, unable to cache dependencies.