Skip to content

installed new virtual env #21

installed new virtual env

installed new virtual env #21

Triggered via push November 3, 2023 12:34
Status Failure
Total duration 12m 51s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.8)
Process completed with exit code 134.
build (3.9)
The job was canceled because "_3_8" failed.
build (3.9)
The operation was canceled.
build (3.10)
The job was canceled because "_3_8" failed.
build (3.10)
The operation was canceled.