Skip to content

Merge pull request #6 from elezar/remove-gitlab-ci #14

Merge pull request #6 from elezar/remove-gitlab-ci

Merge pull request #6 from elezar/remove-gitlab-ci #14

Triggered via push June 26, 2024 14:23
Status Failure
Total duration 2m 3s
Artifacts

image.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (ubi8, vectorAdd)
Process completed with exit code 2.
build (ubuntu18.04, deviceQuery)
The job was canceled because "ubi8_vectorAdd" failed.
build (ubuntu18.04, deviceQuery)
Process completed with exit code 2.
build (ubuntu18.04, vectorAdd)
The job was canceled because "ubi8_vectorAdd" failed.
build (ubuntu18.04, vectorAdd)
The operation was canceled.
build (ubuntu18.04, nbody)
The job was canceled because "ubi8_vectorAdd" failed.
build (ubuntu18.04, nbody)
The operation was canceled.