Skip to content

Changelog for IPP tests bug (Issue #85) #517

Changelog for IPP tests bug (Issue #85)

Changelog for IPP tests bug (Issue #85) #517

Triggered via push September 11, 2024 17:01
Status Failure
Total duration 6h 0m 21s
Artifacts

build.yml

on: push
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 2 warnings
build-linux-openssl
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 360 minutes.
build-linux-openssl
The operation was canceled.
build-macos
gnutls 3.8.4 is already installed and up-to-date. To reinstall 3.8.4, run: brew reinstall gnutls
build-macos
pkg-config 0.29.2_3 is already installed and up-to-date. To reinstall 0.29.2_3, run: brew reinstall pkg-config