Fixes after removing rpc from the contract #289

Fixes after removing rpc from the contract

Fixes after removing rpc from the contract #289

Triggered via pull request September 7, 2023 16:59
Status Failure
Total duration 2m 9s
Artifacts

ci.yml

on: pull_request
Matrix: build
Matrix: asset-registry-test
Matrix: identity-key-test
Matrix: reserve-transfer-test
Matrix: transfer-asset-test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
transfer-asset-test (18.x)
Process completed with exit code 1.
reserve-transfer-test (16.x)
Process completed with exit code 1.
identity-key-test (18.x)
Process completed with exit code 1.
asset-registry-test (16.x)
Process completed with exit code 1.
asset-registry-test (18.x)
The job was canceled because "_16_x" failed.
asset-registry-test (18.x)
The operation was canceled.
transfer-asset-test (16.x)
The job was canceled because "_18_x" failed.
transfer-asset-test (16.x)
The operation was canceled.
reserve-transfer-test (18.x)
The job was canceled because "_16_x" failed.
reserve-transfer-test (18.x)
The operation was canceled.
identity-key-test (16.x)
The job was canceled because "_18_x" failed.
identity-key-test (16.x)
The operation was canceled.
build (16.x)
Process completed with exit code 1.
build (18.x)
The job was canceled because "_16_x" failed.
build (18.x)