chore: Bump goose #581
ci.yaml
on: pull_request
Static analysis
/
Run goose checks
34s
Type check
27s
Check packaging metadata
/
Build and check package metadata
18s
Check currencies
14s
Matrix: Test
Annotations
7 errors
Test (3.11)
Process completed with exit code 1.
|
Test (3.10)
The job was canceled because "_3_11" failed.
|
Test (3.10)
The operation was canceled.
|
Test (3.12)
The job was canceled because "_3_11" failed.
|
Test (3.12)
The operation was canceled.
|
Test (3.13)
The job was canceled because "_3_11" failed.
|
Test (3.13)
The operation was canceled.
|