Bump org.apache.hive:hive-service from 3.1.3 to 4.0.0 #3607
build-backend.yml
on: push
third-party-dependencies-check
6m 17s
Matrix: build-backend
Annotations
8 errors and 2 warnings
build-backend (2.4, 3.3)
Process completed with exit code 1.
|
build-backend (3.2, 2.7)
The job was canceled because "_2_4_3_3" failed.
|
build-backend (3.2, 2.7)
The operation was canceled.
|
build-backend (3.2, 3.3)
The job was canceled because "_2_4_3_3" failed.
|
build-backend (3.2, 3.3)
The operation was canceled.
|
build-backend (2.4, 2.7)
The job was canceled because "_2_4_3_3" failed.
|
build-backend (2.4, 2.7)
The operation was canceled.
|
third-party-dependencies-check
Process completed with exit code 1.
|
build-backend (2.4, 3.3)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
third-party-dependencies-check
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|