Skip to content

chore: merge with upstream v1.0.6 #543

chore: merge with upstream v1.0.6

chore: merge with upstream v1.0.6 #543

Triggered via pull request September 2, 2024 13:00
Status Failure
Total duration 9m 23s
Artifacts

unit.yml

on: pull_request
Matrix: doc
Matrix: test
Ethereum state tests
4m 21s
Ethereum state tests
unit success
2s
unit success
Fit to window
Zoom out
Zoom in

Annotations

17 errors
doc tests (bsc)
Process completed with exit code 101.
doc tests (optimism)
The job was canceled because "bsc" failed.
doc tests (ethereum)
The job was canceled because "bsc" failed.
doc tests (ethereum)
The operation was canceled.
Ethereum state tests
Process completed with exit code 101.
test / bsc (1/3)
Process completed with exit code 101.
test / ethereum (3/3)
The job was canceled because "_1_bsc" failed.
test / bsc (3/3)
The job was canceled because "_1_bsc" failed.
test / optimism (2/3)
The job was canceled because "_1_bsc" failed.
test / ethereum (2/3)
The job was canceled because "_1_bsc" failed.
test / optimism (3/3)
The job was canceled because "_1_bsc" failed.
test / bsc (2/3)
The job was canceled because "_1_bsc" failed.
test / bsc (2/3)
A task was canceled.
test / ethereum (1/3)
The job was canceled because "_1_bsc" failed.
test / ethereum (1/3)
The operation was canceled.
test / optimism (1/3)
The job was canceled because "_1_bsc" failed.
unit success
Process completed with exit code 1.