Skip to content

chore: merge with upstream v1.0.6 #546

chore: merge with upstream v1.0.6

chore: merge with upstream v1.0.6 #546

Triggered via pull request September 2, 2024 13:24
Status Cancelled
Total duration 7m 20s
Artifacts

unit.yml

on: pull_request
Matrix: doc
Matrix: test
Ethereum state tests
2m 18s
Ethereum state tests
unit success
4s
unit success
Fit to window
Zoom out
Zoom in

Annotations

14 errors
doc tests (bsc)
Process completed with exit code 101.
test / bsc (1/3)
Process completed with exit code 101.
test / bsc (3/3)
The job was canceled because "_1_bsc" failed.
test / ethereum (3/3)
The job was canceled because "_1_bsc" failed.
test / ethereum (2/3)
The job was canceled because "_1_bsc" failed.
test / optimism (3/3)
The job was canceled because "_1_bsc" failed.
test / optimism (2/3)
The job was canceled because "_1_bsc" failed.
test / optimism (1/3)
The job was canceled because "_1_bsc" failed.
test / bsc (2/3)
The job was canceled because "_1_bsc" failed.
test / ethereum (1/3)
The job was canceled because "_1_bsc" failed.
test / ethereum (1/3)
The operation was canceled.
Ethereum state tests
Canceling since a higher priority waiting request for 'unit-merge-v1.0.6' exists
Ethereum state tests
The operation was canceled.
unit success
Process completed with exit code 1.