Skip to content

chore: merge with upstream v1.1.0 #594

chore: merge with upstream v1.1.0

chore: merge with upstream v1.1.0 #594

Triggered via pull request October 14, 2024 15:06
@yutianwuyutianwu
synchronize #163
merge-v1.1.0
Status Failure
Total duration 25m 16s
Artifacts

unit.yml

on: pull_request
Matrix: doc
Matrix: test
Ethereum state tests
22m 55s
Ethereum state tests
unit success
3s
unit success
Fit to window
Zoom out
Zoom in

Annotations

18 errors
doc tests (bsc)
Process completed with exit code 101.
doc tests (ethereum)
The job was canceled because "bsc" failed.
doc tests (ethereum)
The operation was canceled.
doc tests (optimism)
The job was canceled because "bsc" failed.
doc tests (optimism)
The operation was canceled.
test / bsc (1/3)
Process completed with exit code 101.
test / optimism (3/3)
The job was canceled because "_1_bsc" failed.
test / bsc (3/3)
The job was canceled because "_1_bsc" failed.
test / ethereum (3/3)
The job was canceled because "_1_bsc" failed.
test / optimism (2/3)
The job was canceled because "_1_bsc" failed.
test / ethereum (2/3)
The job was canceled because "_1_bsc" failed.
test / bsc (2/3)
The job was canceled because "_1_bsc" failed.
test / bsc (2/3)
The operation was canceled.
test / ethereum (1/3)
The job was canceled because "_1_bsc" failed.
test / ethereum (1/3)
The operation was canceled.
test / optimism (1/3)
The job was canceled because "_1_bsc" failed.
test / optimism (1/3)
The operation was canceled.
unit success
Process completed with exit code 1.