Skip to content

Add sched_getscheduler & sched_setscheduler #4390

Add sched_getscheduler & sched_setscheduler

Add sched_getscheduler & sched_setscheduler #4390

Triggered via pull request October 23, 2024 09:19
Status Failure
Total duration 4m 53s
Artifacts

main.yml

on: pull_request
Matrix: Check
Matrix: Check nightly-only targets
Matrix: Check --no-default-features
Matrix: Check selected Tier 3 platforms
Matrix: Test
Matrix: Test rustix_use_experimental_asm
Matrix: Test use-libc
Fit to window
Zoom out
Zoom in

Annotations

18 errors and 1 warning
Test (ubuntu-1.63)
Process completed with exit code 101.
Test (arm-linux-1.63)
The job was canceled because "ubuntu-1_63" failed.
Test (arm-linux-1.63)
The operation was canceled.
Test (powerpc64le-linux-1.63)
The job was canceled because "ubuntu-1_63" failed.
Test (powerpc64le-linux-1.63)
The operation was canceled.
Test (i686-linux-1.63)
The job was canceled because "ubuntu-1_63" failed.
Test (i686-linux-1.63)
The operation was canceled.
Test (aarch64-linux-1.63)
The job was canceled because "ubuntu-1_63" failed.
Test (aarch64-linux-1.63)
The operation was canceled.
Test (s390x-linux-1.63)
The job was canceled because "ubuntu-1_63" failed.
Test (s390x-linux-1.63)
The operation was canceled.
Test (riscv64-linux-1.63)
The job was canceled because "ubuntu-1_63" failed.
Test (riscv64-linux-1.63)
The operation was canceled.
Check (1.63)
Process completed with exit code 101.
Check (stable)
The job was canceled because "_1_63" failed.
Check (stable)
The operation was canceled.
Check (nightly)
The job was canceled because "_1_63" failed.
Check (nightly)
The operation was canceled.
Test (macos-12)
A brownout will take place on November 4, 14:00 UTC - November 5, 00:00 UTC to raise awareness of the upcoming macOS-12 environment removal. For more details, see https://github.com/actions/runner-images/issues/10721