Skip to content

update requirements #121

update requirements

update requirements #121

Triggered via push September 22, 2023 05:00
Status Cancelled
Total duration 31m 22s
Artifacts

CI.yml

on: push
Matrix: test_linux
Matrix: test_macos
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test_linux (3.11)
Process completed with exit code 1.
test_linux (3.10)
Process completed with exit code 1.
test_linux (3.9)
Process completed with exit code 1.
test_macos (3.9)
The run was canceled by @chaoming0625.
test_macos (3.9)
The operation was canceled.
test_macos (3.8)
The run was canceled by @chaoming0625.
test_macos (3.8)
The operation was canceled.
test_macos (3.11)
The run was canceled by @chaoming0625.
test_macos (3.11)
The operation was canceled.
test_macos (3.10)
The run was canceled by @chaoming0625.
test_macos (3.10)
The operation was canceled.