Fuzz Testing Nightly #19

Fuzz Testing Nightly

Fuzz Testing Nightly #19

Triggered via schedule October 12, 2023 11:02
Status Failure
Total duration 1h 30m 30s
Artifacts

nightly-fuzzing.yml

on: schedule
Build Image Verifier seed corpus
6s
Build Image Verifier seed corpus
dpe_libfuzzer  /  reusable_libfuzzer
1h 30m
dpe_libfuzzer / reusable_libfuzzer
dpe_afl  /  reusable_aflplus_plus
2m 44s
dpe_afl / reusable_aflplus_plus
lms_libfuzzer_unstructured  /  reusable_libfuzzer
1h 30m
lms_libfuzzer_unstructured / reusable_libfuzzer
lms_libfuzzer_structured  /  reusable_libfuzzer
1h 30m
lms_libfuzzer_structured / reusable_libfuzzer
lms_afl_unstructured  /  reusable_aflplus_plus
3m 13s
lms_afl_unstructured / reusable_aflplus_plus
lms_afl_structured  /  reusable_aflplus_plus
2m 56s
lms_afl_structured / reusable_aflplus_plus
x509_libfuzzer  /  reusable_libfuzzer
6m 40s
x509_libfuzzer / reusable_libfuzzer
x509_afl  /  reusable_aflplus_plus
4m 6s
x509_afl / reusable_aflplus_plus
image_verify_libfuzzer_unstructured  /  reusable_libfuzzer
1m 41s
image_verify_libfuzzer_unstructured / reusable_libfuzzer
image_verify_libfuzzer_structured  /  reusable_libfuzzer
1m 50s
image_verify_libfuzzer_structured / reusable_libfuzzer
image_verify_afl_unstructured  /  reusable_aflplus_plus
1m 22s
image_verify_afl_unstructured / reusable_aflplus_plus
image_verify_afl_structured  /  reusable_aflplus_plus
1m 15s
image_verify_afl_structured / reusable_aflplus_plus
Fit to window
Zoom out
Zoom in

Annotations

15 errors
image_verify_afl_structured / reusable_aflplus_plus
Process completed with exit code 1.
image_verify_afl_unstructured / reusable_aflplus_plus
Process completed with exit code 1.
image_verify_libfuzzer_unstructured / reusable_libfuzzer
Process completed with exit code 1.
image_verify_libfuzzer_structured / reusable_libfuzzer
Process completed with exit code 1.
dpe_afl / reusable_aflplus_plus
Process completed with exit code 2.
lms_afl_structured / reusable_aflplus_plus
Process completed with exit code 2.
lms_afl_unstructured / reusable_aflplus_plus
Process completed with exit code 2.
x509_afl / reusable_aflplus_plus
Process completed with exit code 2.
x509_libfuzzer / reusable_libfuzzer
Process completed with exit code 1.
dpe_libfuzzer / reusable_libfuzzer
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 90 minutes.
dpe_libfuzzer / reusable_libfuzzer
The operation was canceled.
lms_libfuzzer_structured / reusable_libfuzzer
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 90 minutes.
lms_libfuzzer_structured / reusable_libfuzzer
The operation was canceled.
lms_libfuzzer_unstructured / reusable_libfuzzer
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 90 minutes.
lms_libfuzzer_unstructured / reusable_libfuzzer
The operation was canceled.