DAOS-16251 cart: Ignore expired bulks and rpcs #14971

Draft
wants to merge 36 commits into
base: master
Choose a base branch
from

Conversation

frostedcmos
Copy link
Contributor

  • Switch rpc headers to transfer deadline instead of a timeout
  • Add checks at the start and end of bulk transfer to ensure deadline has not expired.
  • Add deadline expiration checks in all places where rpc_priv timeout is initialized

Required-githooks: true

Before requesting gatekeeper:

  • Two review approvals and any prior change requests have been resolved.
  • Testing is complete and all tests passed or there is a reason documented in the PR why it should be force landed and forced-landing tag is set.
  • Features: (or Test-tag*) commit pragma was used or there is a reason documented that there are no appropriate tags for this PR.
  • Commit messages follows the guidelines outlined here.
  • Any tests skipped by the ticket being addressed have been run and passed in the PR.

Gatekeeper:

  • You are the appropriate gatekeeper to be landing the patch.
  • The PR has 2 reviews by people familiar with the code, including appropriate owners.
  • Githooks were used. If not, request that user install them and check copyright dates.
  • Checkpatch issues are resolved. Pay particular attention to ones that will show up on future PRs.
  • All builds have passed. Check non-required builds for any new compiler warnings.
  • Sufficient testing is done. Check feature pragmas and test tags and that tests skipped for the ticket are run and now pass with the changes.
  • If applicable, the PR has addressed any potential version compatibility issues.
  • Check the target branch. If it is master branch, should the PR go to a feature branch? If it is a release branch, does it have merge approval in the JIRA ticket.
  • Extra checks if forced landing is requested
    • Review comments are sufficiently resolved, particularly by prior reviewers that requested changes.
    • No new NLT or valgrind warnings. Check the classic view.
    • Quick-build or Quick-functional is not used.
  • Fix the commit message upon landing. Check the standard here. Edit it to create a single commit. If necessary, ask submitter for a new summary.

- Switch rpc headers to transfer deadline instead of a timeout
- Add checks at the start and end of bulk transfer to ensure deadline has not expired.
- Add deadline expiration checks in all places where rpc_priv timeout is initialized

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
Copy link

github-actions bot commented Aug 20, 2024

Ticket title is 'DAOS 2.4.2-4: Errored DAOS engine 0 exited unexpectedly on daos_user'
Status is 'In Progress'
Labels: 'ALCF,pre_acceptance_issues,scrubbed_2.8'
https://daosio.atlassian.net/browse/DAOS-16251

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
@daosbuild1
Copy link
Collaborator

Test stage Unit Test on EL 8.8 completed with status UNSTABLE. https://build.hpdd.intel.com/job/daos-stack/job/daos//view/change-requests/job/PR-14971/3/testReport/

@daosbuild1
Copy link
Collaborator

Test stage Unit Test with memcheck on EL 8.8 completed with status UNSTABLE. https://build.hpdd.intel.com/job/daos-stack/job/daos//view/change-requests/job/PR-14971/3/testReport/

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
Allow-unstable-test: true

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
Allow-unstable-test: true

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
if (crt_bulk_desc_expired(bulk_desc))
D_GOTO(out, rc = -DER_DEADLINE_EXPIRED);

D_ALLOC_PTR(verify_arg);
Copy link
Collaborator

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

you should avoid allocating anything here

Copy link
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

sure, this is for now for experimentation, not happy with this alloc either, but cant think of cleaner way

Copy link
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Incorporated verify_cb into the existing cb info structs, avoiding extra allocations on this path

@@ -583,7 +583,7 @@ crt_proc_in_common(crt_proc_t proc, crt_rpc_input_t *data)
);
hdr->cch_dst_tag = rpc_priv->crp_pub.cr_ep.ep_tag;

hdr->cch_src_timeout = rpc_priv->crp_timeout_sec;
hdr->cch_src_deadline_sec = timeout_to_deadline(rpc_priv->crp_timeout_sec);
Copy link
Collaborator

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

I think in general we would want to use half of the timeout value, based on what Sean had mentioned in the past, ie. client timeout value is double the server timeout.

Copy link
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

i am not sure using half is the right approach. i could see using "deadline - [small amount]" to account for the response delay, but for example, expiring a "60second timeout" rpc in 30 seconds (vs say 59 seconds on the receiver) would cause a lot of test issues and weird behaviors.

Skip-nlt: true

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
@daosbuild1
Copy link
Collaborator

Test stage Test RPMs on EL 8.6 completed with status FAILURE. https://build.hpdd.intel.com//job/daos-stack/job/daos/view/change-requests/job/PR-14971/7/execution/node/1053/log

@daosbuild1
Copy link
Collaborator

Test stage Functional on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com//job/daos-stack/job/daos/view/change-requests/job/PR-14971/7/execution/node/1141/log

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
Skip-nlt: true

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
@daosbuild1
Copy link
Collaborator

Test stage Functional on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com//job/daos-stack/job/daos/view/change-requests/job/PR-14971/10/execution/node/1104/log

Required-githooks: true
Skip-nlt: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
Skip-nlt: true

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
@daosbuild1
Copy link
Collaborator

Test stage Functional on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com//job/daos-stack/job/daos/view/change-requests/job/PR-14971/12/execution/node/1105/log

Skin-nlt: true

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
@daosbuild1
Copy link
Collaborator

Test stage Functional on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com//job/daos-stack/job/daos/view/change-requests/job/PR-14971/13/execution/node/1183/log

of the second, causing rpc to expire prematurely.

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
Allow-unstable-test: true

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
- add crp_deadline_sec to rpc_priv. rpc header is now populated from it,
instead of timeout being converted to deadline at the time of the encoding.

- deadline is now set at crt_req_send() time. for collective
calls, if deadline is already set prior to crt_req_send(), then
deadline is left alone. Otherwise a timeout is converted to the deadline.

This is done for children of collective rpcs to properly inherit the parents
deadline.

- colletive rpcs will also set local expiration time now based on deadline, instead
of previously incorrect behavior with each child having its own timeout starting from 'now'.

- 1 second test timeouts expanded to 3 seconds, to allow for room due to 1 sec expiration
granularity.

- fix: realtime clock is used now in bulk expiration handling similar to
rpc deadline handling

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
@daosbuild1
Copy link
Collaborator

Test stage NLT on EL 8.8 completed with status UNSTABLE. https://build.hpdd.intel.com/job/daos-stack/job/daos//view/change-requests/job/PR-14971/17/testReport/

@daosbuild1
Copy link
Collaborator

Test stage Functional on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com//job/daos-stack/job/daos/view/change-requests/job/PR-14971/17/execution/node/1206/log

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
@daosbuild1
Copy link
Collaborator

Test stage Functional on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com//job/daos-stack/job/daos/view/change-requests/job/PR-14971/19/execution/node/1209/log

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
@daosbuild1
Copy link
Collaborator

Test stage Functional on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com//job/daos-stack/job/daos/view/change-requests/job/PR-14971/21/execution/node/1160/log

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
in existing bulk cb completion

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
used for backwards compatability support of older clients:

- Newer clients/servers will set this flag, enabling new deadline logic
- If flag not set on incoming rpc, deadline is considered to be a timeout instead
(old client behavior), and old logic for using that timeout is used then.

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
@daosbuild1
Copy link
Collaborator

Test stage Functional on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com//job/daos-stack/job/daos/view/change-requests/job/PR-14971/26/execution/node/1232/log

after alloc

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
@daosbuild1
Copy link
Collaborator

Test stage NLT on EL 8.8 completed with status UNSTABLE. https://build.hpdd.intel.com/job/daos-stack/job/daos//view/change-requests/job/PR-14971/30/testReport/

Required-githooks: true

Signed-off-by: Alexander A Oganezov <alexander.a.oganezov@intel.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
None yet
Development

Successfully merging this pull request may close these issues.

3 participants