Skip to content

Integration tests

Integration tests #66

Triggered via schedule January 19, 2024 16:25
Status Failure
Total duration 4h 10m 7s
Artifacts

test-integration.yml

on: schedule
Matrix: tests-windows
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

4 errors
tests-windows (windows-2022)
Process completed with exit code 1.
tests (macos-13)
Process completed with exit code 2.
tests (ubuntu-22.04)
The job was canceled because "macos-13" failed.
tests (ubuntu-22.04)
The operation was canceled.