Skip to content

Code change pipeline to development by @eveleighoj #21

Code change pipeline to development by @eveleighoj

Code change pipeline to development by @eveleighoj #21

Triggered via push July 31, 2024 10:48
Status Cancelled
Total duration 8m 45s
Artifacts 1

base.yml

on: push
detect-environments
5s
detect-environments
Matrix: deploy-changes
Fit to window
Zoom out
Zoom in

Annotations

5 errors
deploy-changes (staging) / deploy
The run was canceled by @eveleighoj.
deploy-changes (staging) / deploy
The operation was canceled.
deploy-changes (production) / deploy
The run was canceled by @eveleighoj.
deploy-changes (production) / deploy
The operation was canceled.
deploy-changes (development) / deploy
The run was canceled by @eveleighoj.

Artifacts

Produced during runtime
Name Size
playwright-report Expired
191 KB