Skip to content

Unit test smoke test #84

Unit test smoke test

Unit test smoke test #84

Triggered via schedule December 9, 2024 06:49
Status Failure
Total duration 2m 3s
Artifacts

smoke-test.yml

on: schedule
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 2 warnings
build (3.9)
Process completed with exit code 5.
build (3.10)
Process completed with exit code 5.
build (3.11)
The job was canceled because "_3_10" failed.
build (3.11)
The operation was canceled.
build (3.12)
The job was canceled because "_3_10" failed.
build (3.12)
The operation was canceled.
build (3.9)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
build (3.10)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636