Skip to content

chore: fix the upstream schema link #986

chore: fix the upstream schema link

chore: fix the upstream schema link #986

Triggered via push August 5, 2024 11:39
Status Failure
Total duration 1m 3s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (ubuntu-latest, 20)
Process completed with exit code 1.
test (ubuntu-latest, 18)
The job was canceled because "ubuntu-latest_20" failed.
test (ubuntu-latest, 18)
Process completed with exit code 1.
test (windows-latest, 18)
The job was canceled because "ubuntu-latest_20" failed.
test (windows-latest, 18)
The operation was canceled.
test (windows-latest, 20)
The job was canceled because "ubuntu-latest_20" failed.
test (windows-latest, 20)
The operation was canceled.
test (macOS-latest, 20)
The job was canceled because "ubuntu-latest_20" failed.
test (macOS-latest, 20)
The operation was canceled.
test (macOS-latest, 18)
The job was canceled because "ubuntu-latest_20" failed.
test (macOS-latest, 18)
The operation was canceled.