Skip to content

Add changelog

Add changelog #3

Triggered via push September 23, 2024 13:53
Status Cancelled
Total duration 10d 1h 25m 56s
Artifacts

test-docker.yml

on: push
docker (docker/Dockerfile.revad)  /  docker
0s
docker (docker/Dockerfile.revad) / docker
docker (docker/Dockerfile.revad-eos)  /  docker
0s
docker (docker/Dockerfile.revad-eos) / docker
Matrix: docker
Fit to window
Zoom out
Zoom in

Annotations

5 errors
docker (docker/Dockerfile.revad-eos) / docker
The run was canceled.
docker (docker/Dockerfile.revad) / docker
The run was canceled.
docker (docker/Dockerfile.reva) / docker
The run was canceled.
docker (docker/Dockerfile.revad-ceph) / docker
The run was canceled.
docker (docker/Dockerfile.revad-eos) / docker
The run was canceled.