Skip to content

Commit

Permalink
Update branch names to reflect configurator's new deployment. (qmk#19999
Browse files Browse the repository at this point in the history
)
  • Loading branch information
tzarc authored Mar 3, 2023
1 parent 6fabc33 commit 7ebb8c2
Show file tree
Hide file tree
Showing 2 changed files with 19 additions and 6 deletions.
8 changes: 4 additions & 4 deletions docs/breaking_changes.md
Original file line number Diff line number Diff line change
Expand Up @@ -34,7 +34,7 @@ The next Breaking Change is scheduled for May 28, 2023.

## What changes will be included?

To see a list of breaking changes merge candidates you can look at the [`core` label](https://github.com/qmk/qmk_firmware/pulls?q=is%3Aopen+label%3Acore+is%3Apr). This label is applied whenever a PR is raised or changed, but only if the PR includes changes to core areas of QMK Firmware. A PR with that label applied is not guaranteed to be merged in the current cycle. New changes might be added between now and when `develop` is closed, and it is generally the responsibility of the submitter to handle conflicts. There is also another label used by QMK Collaborators -- `breaking_change_YYYYqN` -- which signifies to maintainers that it is a strong candidate for inclusion, and should be prioritised for review.
To see a list of breaking changes merge candidates you can look at the [`core` label](https://github.com/qmk/qmk_firmware/pulls?q=is%3Aopen+label%3Acore+is%3Apr). This label is applied whenever a PR is raised or changed, but only if the PR includes changes to core areas of QMK Firmware. A PR with that label applied is not guaranteed to be merged in the current cycle. New changes might be added between now and when `develop` is closed, and it is generally the responsibility of the submitter to handle conflicts. There is also another label used by QMK Collaborators -- `breaking_change_YYYYqN` -- which signifies to maintainers that it is a strong candidate for inclusion, and should be prioritized for review.

If you want your breaking change to be included in this round you need to create a PR and have it accepted by QMK Collaborators before `develop` closes. After `develop` closes, new submissions will be deferred to the next breaking changes cycle.

Expand Down Expand Up @@ -127,12 +127,12 @@ This happens immediately after the previous `develop` branch is merged to `maste
* Validate each submodule SHA1 matches the qmk fork, e.g. for ChibiOS:
* Go to [qmk/ChibiOS](https://github.com/qmk/ChibiOS)
* Compare the commit hash in the above output to the commit hash in the repository
* If there's a mismatch, that repository needs to have its `master` branch updated to match (otherwise Configurator won't work):
* If there's a mismatch, that repository needs to have its `qmk-master` branch updated to match (otherwise Configurator won't work):
* `cd lib/chibios`
* `git fetch --all`
* `git checkout master`
* `git checkout qmk-master`
* `git reset --hard <commit hash>`
* `git push origin master --force-with-lease`
* `git push origin qmk-master --force-with-lease`

* Announce that both `master` and `develop` are now unlocked -- message `@Breaking Changes Updates` on `#qmk_firmware` in Discord:
* `@Breaking Changes Updates -- Hey folks, develop has now been merged into master -- newest batch of changes are now available for everyone to use!`
Expand Down
17 changes: 15 additions & 2 deletions docs/chibios_upgrade_instructions.md
Original file line number Diff line number Diff line change
Expand Up @@ -4,7 +4,7 @@ ChibiOS and ChibiOS-Contrib need to be updated in tandem -- the latter has a bra

## Getting ChibiOS

* `svn` Initialisation:
* `svn` Initialization:
* Only needed to be done once
* You might need to separately install `git-svn` package in your OS's package manager
* `git svn init --stdlayout --prefix='svn/' http://svn.osdn.net/svnroot/chibios/`
Expand All @@ -21,7 +21,7 @@ ChibiOS and ChibiOS-Contrib need to be updated in tandem -- the latter has a bra

## Getting ChibiOS-Contrib

* `git` Initialisation:
* `git` Initialization:
* `git clone git@github.com:qmk/ChibiOS-Contrib`
* `git remote add upstream https://github.com/ChibiOS/ChibiOS-Contrib`
* `git checkout -b chibios-20.3.x upstream/chibios-20.3.x`
Expand Down Expand Up @@ -57,3 +57,16 @@ ChibiOS and ChibiOS-Contrib need to be updated in tandem -- the latter has a bra
* `git commit -am 'Update ChibiOS to 99.9.9'`
* `git push --set-upstream origin chibios-version-bump`
* Make a PR to qmk_firmware with the new branch

## When merging a PR containing an upgrade of ChibiOS/ChibiOS-Contrib:

* Update the target branch if the merge target was `master`:
* `git checkout qmk-master`
* `git reset --hard develop_YYYY_qN`
* `git push origin qmk-master --force-with-lease`
* Update the target branch if the merge target was `develop`:
* `git checkout qmk-develop`
* `git reset --hard develop_YYYY_qN`
* `git push origin qmk-develop --force-with-lease`

Note that when merging `develop` to `master`, the first workflow should still be followed.

0 comments on commit 7ebb8c2

Please sign in to comment.