Notifications
You must be signed in to change notification settings - Fork 8
Meeting log 2016 05 06
Participants: All members of the team
-
SMART: May 23. 2016
-
University Day (Organized by Ericsson): May 31. 2016
-
EclipseCon France: June 7-9. 2016. We should prepare
-
a simple demo and
-
a flyer for the project
-
-
EclipseCon Europe: end of October/start of November 2016. Location: Ludwigsburg, on-site demo
-
Eliminate SPOFs from the system
-
Find a permanent location for the demonstrator (anywhere anytime)
-
Prepare ready-to-go scenarios for different demos
-
Documentation is missing for several components
-
Textual documentation
-
SysML for requirements
-
SysML models for the system components
-
-
Testing
-
Segment switch. (Relay related issue)
-
Automatic deployment, configuration management
-
Integration of control electronics to the desk
-
Enhanced camera, deploy the computer vision system to the desk
-
Missing sensors for the robot arm. (Crane grabber closed/open)
-
Engine control from PC - replace multimouse
-
Rebuild robot arm (from scratch)
-
Lighting
-
Unit tests for distibuted logic (now HIL tests available)
-
CV module
-
Monitornig & dashboard is needed (fat client and/or web application)
-
Live model component (related to the dashboard and monitoring)
-
Refactor VQL pattern definitions
-
Performance issues on current verison:
-
solution A: keep the hardware, rewrite the client in C
-
solution B: replace the hardware (potentially with Raspberry PI)
-
-
Smoke tests were done to the code, but nothing more
-
Future and perspectives for OpenModelica model
-
OpenModelica integration issues and challenges
-
The "computer vision" component depends on the robot arm
-
Integration of new subsystems (drone, autonomous car) are postponed for now
-
TODO Vöri: involve Bence Graics in the team
-
Zoltán Micskei offered help for testing and verification
-
Time synchronization is typically applied when multiple sensors are present in a system (application of Samu’s and Gergő’s expertise)
-
Preparations for the "ReTe" subject
-
projektek: kiberfizikai rendszerek-rendszerek kollaborációja.
-
project management: in addition to regular team meetings Slack is used for communication and Github for issue tracking
-
Comments from Zsolti:
-
A list of items should be created. In order to keep track of the available devices Marci should administer handing out and taking back devices
-
The current desk on which the railroad is mounted is aging, and the tracks are deforming. This is an issue to be solved by building a new, more durable desk.
-