Skip to content

refactor: streamline GenesisBuilder RawGenesisTransaction GenesisBlock flow #11272

refactor: streamline GenesisBuilder RawGenesisTransaction GenesisBlock flow

refactor: streamline GenesisBuilder RawGenesisTransaction GenesisBlock flow #11272

Triggered via pull request October 24, 2024 03:30
Status Cancelled
Total duration 3m 13s
Artifacts

iroha2-dev-pr.yml

on: pull_request
build_wasm_samples
2m 58s
build_wasm_samples
consistency
35s
consistency
fmt_and_clippy
1m 7s
fmt_and_clippy
pr-generator-build
0s
pr-generator-build
test_with_coverage
0s
test_with_coverage
docker-compose-and-pytests
0s
docker-compose-and-pytests
Fit to window
Zoom out
Zoom in

Annotations

12 errors
build_wasm_samples
Canceling since a higher priority waiting request for 'I2::Dev::Tests-refs/pull/5191/merge' exists
build_wasm_samples
The operation was canceled.
consistency
Canceling since a higher priority waiting request for 'I2::Dev::Tests-refs/pull/5191/merge' exists
consistency
The operation was canceled.
consistency
Value cannot be null. (Parameter 'ContainerId')
consistency
Value cannot be null. (Parameter 'ContainerId')
consistency
Value cannot be null. (Parameter 'ContainerId')
fmt_and_clippy
Canceling since a higher priority waiting request for 'I2::Dev::Tests-refs/pull/5191/merge' exists
fmt_and_clippy
Process completed with exit code 1.
fmt_and_clippy
Process completed with exit code 1.
fmt_and_clippy
Process completed with exit code 1.
fmt_and_clippy
The operation was canceled.