Skip to content

chore(deps): update linters #2230

chore(deps): update linters

chore(deps): update linters #2230

Triggered via push December 17, 2024 02:36
Status Failure
Total duration 44s
Artifacts

test.yml

on: push
Matrix: test_matrix
required_check
0s
required_check
Fit to window
Zoom out
Zoom in

Annotations

18 errors and 1 warning
test_matrix (macos-latest, 20)
Process completed with exit code 2.
test_matrix (ubuntu-latest, 18)
The job was canceled because "macos-latest_20" failed.
test_matrix (ubuntu-latest, 18)
Process completed with exit code 2.
test_matrix (ubuntu-latest, 20)
The job was canceled because "macos-latest_20" failed.
test_matrix (ubuntu-latest, 20)
Process completed with exit code 2.
test_matrix (windows-latest, 21)
The job was canceled because "macos-latest_20" failed.
test_matrix (windows-latest, 21)
The operation was canceled.
test_matrix (macos-latest, 18)
The job was canceled because "macos-latest_20" failed.
test_matrix (macos-latest, 18)
Process completed with exit code 2.
test_matrix (macos-latest, 21)
The job was canceled because "macos-latest_20" failed.
test_matrix (macos-latest, 21)
Process completed with exit code 2.
test_matrix (windows-latest, 18)
The job was canceled because "macos-latest_20" failed.
test_matrix (windows-latest, 18)
The operation was canceled.
test_matrix (ubuntu-latest, 21)
The job was canceled because "macos-latest_20" failed.
test_matrix (ubuntu-latest, 21)
The operation was canceled.
test_matrix (windows-latest, 20)
The job was canceled because "macos-latest_20" failed.
test_matrix (windows-latest, 20)
The operation was canceled.
required_check
Process completed with exit code 1.
required_check
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636