Skip to content

initial commit

initial commit #1

Triggered via push October 6, 2023 20:30
Status Failure
Total duration 20s
Artifacts

CI.yml

on: push
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

11 errors
tests (14)
Process completed with exit code 1.
tests (13)
The job was canceled because "_14" failed.
tests (13)
Process completed with exit code 1.
tests (10)
The job was canceled because "_14" failed.
tests (10)
Process completed with exit code 1.
tests (12)
The job was canceled because "_14" failed.
tests (12)
Process completed with exit code 1.
tests (15)
The job was canceled because "_14" failed.
tests (15)
The operation was canceled.
tests (11)
The job was canceled because "_14" failed.
tests (11)
The operation was canceled.