Increase close time of info needed tickets to 28 (#4304) #4175
all-checks.yml
on: push
Matrix: e2e-tests
Matrix: lint
Matrix: pip-compile
Matrix: unit-tests
Annotations
10 errors
unit-tests (windows-latest, 3.11) / unit-tests
Process completed with exit code 1.
|
unit-tests (windows-latest, 3.10) / unit-tests
FailFast: cancelling since parallel instance has failed
|
unit-tests (windows-latest, 3.10) / unit-tests
The operation was canceled.
|
unit-tests (windows-latest, 3.9) / unit-tests
FailFast: cancelling since parallel instance has failed
|
unit-tests (windows-latest, 3.9) / unit-tests
The operation was canceled.
|
unit-tests (windows-latest, 3.12) / unit-tests
FailFast: cancelling since parallel instance has failed
|
unit-tests (windows-latest, 3.12) / unit-tests
The operation was canceled.
|
e2e-tests (windows-latest, 3.10) / e2e-tests
Process completed with exit code 1.
|
e2e-tests (windows-latest, 3.9) / e2e-tests
FailFast: cancelling since parallel instance has failed
|
e2e-tests (windows-latest, 3.9) / e2e-tests
The operation was canceled.
|