Test nagfor #623
Triggered via schedule
September 14, 2024 19:05
Status
Failure
Total duration
11h 52m 35s
Artifacts
8
test_nagfor.yml
on: schedule
Matrix: Run nagfor tests
check_success_timeout
13s
Annotations
9 errors
Run nagfor tests (i2, bobyqa, small)
The job running on runner zM0 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, bobyqa, small)
The operation was canceled.
|
Run nagfor tests (i2, lincoa, big)
The job running on runner zS0 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, lincoa, big)
The operation was canceled.
|
Run nagfor tests (i2, newuoa, big)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
Run nagfor tests (i2, newuoa, big)
The operation was canceled.
|
Run nagfor tests (i2, newuoa, small)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
Run nagfor tests (i2, newuoa, small)
The operation was canceled.
|
check_success_timeout
Process completed with exit code 42.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
bobyqa-i2-big--g
|
14 KB |
|
bobyqa-i2-small--g
|
214 KB |
|
cobyla-i2-big--g
|
82.8 KB |
|
cobyla-i2-small--g
|
148 KB |
|
lincoa-i2-big--g
|
266 KB |
|
lincoa-i2-small--g
|
2.72 MB |
|
uobyqa-i2-big--g
|
3.97 KB |
|
uobyqa-i2-small--g
|
20.6 KB |
|