cidata: fix upgrading nerdctl #4980
You are viewing an older attempt in the history of this workflow run.
View latest attempt.
test.yml
on: pull_request
Lints
2m 53s
Windows tests
6m 30s
Integration tests
27m 51s
VMNet test
13m 30s
Matrix: Colima
Matrix: Integration tests (on Linux)
Matrix: Unit tests
Matrix: Upgrade test
Matrix: vz
Annotations
1 error and 8 warnings
vz (fedora.yaml)
The hosted runner encountered an error while running your job. (Error Type: Disconnect).
|
Integration tests (on Linux) (experimental/net-user-v2.yaml)
Attempt 1 failed. Reason: Child_process exited with error code 1
|
vz (fedora.yaml)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
vz (experimental/vz.yaml)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
VMNet test
qemu 9.0.1 is already installed and up-to-date.
To reinstall 9.0.1, run:
brew reinstall qemu
|
Upgrade test (v0.15.1)
qemu 9.0.1 is already installed and up-to-date.
To reinstall 9.0.1, run:
brew reinstall qemu
|
Integration tests
curl 8.8.0 is already installed and up-to-date.
To reinstall 8.8.0, run:
brew reinstall curl
|
Integration tests
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
Integration tests
Attempt 1 failed. Reason: Child_process exited with error code 1
|