Skip to content

chore(deps): bump github.com/goccy/go-yaml from 1.13.6 to 1.15.7 in the go group across 1 directory #66

chore(deps): bump github.com/goccy/go-yaml from 1.13.6 to 1.15.7 in the go group across 1 directory

chore(deps): bump github.com/goccy/go-yaml from 1.13.6 to 1.15.7 in the go group across 1 directory #66

Triggered via pull request December 7, 2024 01:30
Status Failure
Total duration 21s
Artifacts

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test (ubuntu-22.04, 1.21)
Process completed with exit code 2.
test (ubuntu-22.04, 1.23)
Process completed with exit code 2.
test (ubuntu-22.04, 1.20)
The job was canceled because "ubuntu-22_04_1_21" failed.
test (ubuntu-22.04, 1.20)
The operation was canceled.
test (ubuntu-22.04, 1.19)
The job was canceled because "ubuntu-22_04_1_21" failed.
test (ubuntu-22.04, 1.19)
The operation was canceled.
test (ubuntu-22.04, 1.22)
The job was canceled because "ubuntu-22_04_1_21" failed.
test (ubuntu-22.04, 1.22)
The operation was canceled.