Skip to content

Fix reference to action-is-release #26

Fix reference to action-is-release

Fix reference to action-is-release #26

Triggered via push July 13, 2023 21:18
Status Cancelled
Total duration 2m 55s
Artifacts

main.yml

on: push
Check workflows
5s
Check workflows
Matrix: Lint, build, and test / Prepare
Matrix: Lint, build, and test / Build
Matrix: Lint, build, and test / Lint
Matrix: Lint, build, and test / Test
Matrix: Lint, build, and test / Validate changelog
All jobs complete
0s
All jobs complete
Determine whether this is a release merge commit
0s
Determine whether this is a release merge commit
All jobs pass
0s
All jobs pass
Publish release  /  publish-release
Publish release / publish-release
Publish release  /  publish-npm-dry-run
Publish release / publish-npm-dry-run
Publish release  /  publish-npm
Publish release / publish-npm
Fit to window
Zoom out
Zoom in

Annotations

69 errors
Lint, build, and test / Lint (20.x)
The run was canceled by @mcmire.
Lint, build, and test / Test (18.x, @metamask/controller-utils)
The operation was canceled.
Lint, build, and test / Test (18.x, @metamask/ens-controller)
The operation was canceled.
Lint, build, and test / Test (18.x, @metamask/address-book-controller)
The operation was canceled.
Lint, build, and test / Test (16.x, @metamask/rate-limit-controller)
The operation was canceled.
Lint, build, and test / Test (16.x, @metamask/transaction-controller)
The operation was canceled.
Lint, build, and test / Test (18.x, @metamask/approval-controller)
The operation was canceled.
Lint, build, and test / Test (16.x, @metamask/preferences-controller)
The operation was canceled.
Lint, build, and test / Test (16.x, @metamask/permission-controller)
The operation was canceled.
Lint, build, and test / Test (18.x, @metamask/assets-controllers)
The operation was canceled.
Lint, build, and test / Test (18.x, @metamask/announcement-controller)
The operation was canceled.
Lint, build, and test / Test (16.x, @metamask/signature-controller)
The operation was canceled.
Lint, build, and test / Test (18.x, @metamask/base-controller)
The operation was canceled.
Lint, build, and test / Test (18.x, @metamask/composable-controller)
The operation was canceled.
Lint, build, and test / Test (16.x, @metamask/network-controller)
The operation was canceled.
Lint, build, and test / Build (20.x)
The run was canceled by @mcmire.
Lint, build, and test / Build (20.x)
The operation was canceled.
Lint, build, and test / Test (16.x, @metamask/assets-controllers)
The operation was canceled.
All jobs pass
Process completed with exit code 1.