workaround make -Otarget bug on windows #71
build-and-test.yml
on: push
Matrix: build-cross
Matrix: build-linux
Matrix: build-macos
Matrix: build-windows
Matrix: unit-test
Annotations
6 errors
Unit tests on windows-2019
Process completed with exit code 1.
|
Unit tests on windows-2022
Process completed with exit code 1.
|
gcc / default / windows-2019
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 360 minutes.
|
gcc / default / windows-2019
The operation was canceled.
|
gcc / debug / windows-2022
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 360 minutes.
|
gcc / debug / windows-2022
The operation was canceled.
|