Skip to content

chore(deps): bump golang.org/x/text from 0.9.0 to 0.11.0 in /modulegen #1612

chore(deps): bump golang.org/x/text from 0.9.0 to 0.11.0 in /modulegen

chore(deps): bump golang.org/x/text from 0.9.0 to 0.11.0 in /modulegen #1612

Status Failure
Total duration 1h 55m 36s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

3 errors
test (1.19.x, ubuntu-latest)
Process completed with exit code 2.
test (1.x, ubuntu-latest)
The job was canceled because "_1_19_x_ubuntu-latest" failed.
test (1.x, ubuntu-latest)
The operation was canceled.