Skip to content

Prepare DEVELOPMENT system #3

Prepare DEVELOPMENT system

Prepare DEVELOPMENT system #3

Triggered via push September 17, 2023 12:28
Status Failure
Total duration 3m 40s
Artifacts 3
Matrix: continuous-integration / Run Fast Testsuite
Matrix: continuous-integration / Run Testsuite Tier 1
continuous-integration  /  Make Documentation
1m 40s
continuous-integration / Make Documentation
Matrix: continuous-integration / Perform Quality Assurance
Matrix: continuous-integration / Run Testsuite Tier 2
Fit to window
Zoom out
Zoom in

Annotations

3 errors
continuous-integration / Run Testsuite Tier 1 (abcl, macos-latest)
Process completed with exit code 1.
continuous-integration / Run Testsuite Tier 1 (sbcl, macos-latest)
The operation was canceled.
continuous-integration / Run Testsuite Tier 1 (abcl, ubuntu-latest)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
org.melusina.atelier.html Expired
20.6 KB
org.melusina.atelier.info Expired
9.73 KB
org.melusina.atelier.pdf Expired
95.9 KB