Build #89
build.yml
on: workflow_run
Matrix: build_linux
Matrix: build_mac
Matrix: build_windows
Annotations
13 errors and 1 warning
build_linux (icy_draw)
Process completed with exit code 1.
|
build_linux (icy_view)
The job was canceled because "icy_draw" failed.
|
build_linux (icy_view)
The operation was canceled.
|
build_linux (icy_term)
The job was canceled because "icy_draw" failed.
|
build_linux (icy_term)
The operation was canceled.
|
build_mac (icy_draw)
Process completed with exit code 101.
|
build_mac (icy_view)
The job was canceled because "icy_draw" failed.
|
build_mac (icy_view)
The operation was canceled.
|
build_mac (icy_term)
The job was canceled because "icy_draw" failed.
|
build_mac (icy_term)
The operation was canceled.
|
build_windows (icy_draw)
Process completed with exit code 1.
|
build_windows (icy_term)
The job was canceled because "icy_draw" failed.
|
build_windows (icy_term)
The operation was canceled.
|
build_linux (icy_draw)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
icy_play_windows_
|
1.08 MB |
|
icy_view_windows_
|
4.55 MB |
|