Skip to content

Build

Build #90

Triggered via workflow run December 22, 2024 09:39
@mkruegermkrueger
completed 9443e00
Status Failure
Total duration 5m 32s
Artifacts 1

build.yml

on: workflow_run
Matrix: build_linux
Matrix: build_mac
Matrix: build_windows
Fit to window
Zoom out
Zoom in

Annotations

15 errors and 1 warning
build_linux (icy_draw)
Process completed with exit code 1.
build_linux (icy_view)
The job was canceled because "icy_draw" failed.
build_linux (icy_view)
The operation was canceled.
build_linux (icy_term)
The job was canceled because "icy_draw" failed.
build_linux (icy_term)
The operation was canceled.
build_mac (icy_draw)
Process completed with exit code 101.
build_windows (icy_draw)
Process completed with exit code 1.
build_mac (icy_view)
The job was canceled because "icy_draw" failed.
build_mac (icy_view)
The operation was canceled.
build_mac (icy_term)
The job was canceled because "icy_draw" failed.
build_mac (icy_term)
The operation was canceled.
build_windows (icy_view)
The job was canceled because "icy_draw" failed.
build_windows (icy_view)
The operation was canceled.
build_windows (icy_term)
The job was canceled because "icy_draw" failed.
build_windows (icy_term)
The operation was canceled.
build_linux (icy_draw)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
icy_play_windows_
1.08 MB