Skip to content

chore(release): publish 2.2.0 #92

chore(release): publish 2.2.0

chore(release): publish 2.2.0 #92

Triggered via push January 15, 2024 16:55
Status Failure
Total duration 28s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Test koam-router (Node 20)
Process completed with exit code 1.
Test koam-router (Node 18)
The job was canceled because "_20_koam-router" failed.
Test koam-router (Node 18)
Process completed with exit code 1.
Test koam-core (Node 18)
The job was canceled because "_20_koam-router" failed.
Test koam-core (Node 18)
The operation was canceled.
Test koam-core (Node 20)
The job was canceled because "_20_koam-router" failed.
Test koam-core (Node 20)
The operation was canceled.