Fix finalize changelog #231
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
ubuntu-latest.yml
on: pull_request
ubuntu-latest
3m 38s
Annotations
1 error and 4 warnings
ubuntu-latest
Response status code does not indicate success: 503 (Service Unavailable).
|
ubuntu-latest
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/f43a0e5ff2bd294095638e18286ca9a3d1956744'. Error: Response status code does not indicate success: 503 (Service Unavailable).
|
ubuntu-latest
Back off 20.694 seconds before retry.
|
ubuntu-latest
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/f43a0e5ff2bd294095638e18286ca9a3d1956744'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
ubuntu-latest
Back off 15.375 seconds before retry.
|