feat(forwarder): add OTEL tracing (#222) #201
release.yaml
on: push
Annotations
3 errors
tests / test-integration (tests/firehose.tftest.hcl)
Process completed with exit code 2.
|
tests / test-integration (tests/stack.tftest.hcl)
The job was canceled because "tests_firehose_tftest_hcl" failed.
|
tests / test-integration (tests/stack.tftest.hcl)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
repo-and-sam-build
Expired
|
72.2 MB |
|