Skip to content

first pass towards making the tool a launcher and client to the engine #610

first pass towards making the tool a launcher and client to the engine

first pass towards making the tool a launcher and client to the engine #610

Triggered via push January 8, 2024 21:13
Status Failure
Total duration 22s
Artifacts

go.yml

on: push
Coverage
5s
Coverage
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Coverage
Process completed with exit code 1.
Test (ubuntu-latest, 1.19)
Process completed with exit code 1.
Test (windows-latest, 1.19)
The job was canceled because "ubuntu-latest_1_19" failed.
Test (windows-latest, 1.19)
The operation was canceled.
Test (macos-latest, 1.19)
The job was canceled because "ubuntu-latest_1_19" failed.
Test (macos-latest, 1.19)
The operation was canceled.