PB-7476-sync: Merging commits from 1.2.15 to master and updating node label as per the best practices #398
Travis CI / Travis CI - Branch
succeeded
Oct 4, 2024 in 36m 49s
Build Passed
The build passed.
Details
This is a normal build for the PB-7476-sync branch. You should be able to reproduce it by checking out the branch locally.
Jobs and Stages
This build only has a single job.
You can use jobs to test against multiple versions of your runtime or dependencies, or to speed up your build.
Build Configuration
Build Option | Setting |
---|---|
Language | Go |
Operating System | Linux (Focal) |
Go Version | 1.21.11 |
Build Configuration
{
"language": "go",
"os": [
"linux"
],
"dist": "focal",
"sudo": true,
"env": [
"global={:GO111MODULE=>\"on\"}"
],
"go": [
"1.21.11"
],
"script": [
"if [ -n \"${TRAVIS_TAG}\" ]; then\n export RELEASE_VER=${TRAVIS_TAG}\nelif [ \"${TRAVIS_BRANCH}\" == \"master\" ]; then\n export DOCKER_IMAGE_TAG=master-latest\nelse\n export RELEASE_VER=`git rev-parse --short HEAD`\nfi\nmake all &&\nif [ \"${TRAVIS_PULL_REQUEST}\" == \"false\" ]; then\n docker login -u \"${DOCKER_USER}\" -p \"${DOCKER_PASS}\";\n make deploy;\nfi\n"
],
"notifications": {
"email": [
{
"on_success": "always",
"on_failure": "always"
}
]
},
"after_success": [
"go get github.com/mattn/goveralls",
"goveralls -coverprofile=coverage.txt -service=travis-pro -repotoken $COVERALLS_TOKEN"
]
}
Loading