Skip to content

proptest-derive: prepare 0.5.1 patch release #594

proptest-derive: prepare 0.5.1 patch release

proptest-derive: prepare 0.5.1 patch release #594

Triggered via push December 15, 2024 19:11
Status Failure
Total duration 4m 33s
Artifacts

rust.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

3 errors
build (nightly)
Process completed with exit code 101.
build (pinned)
The job was canceled because "nightly" failed.
build (pinned)
The operation was canceled.