Skip to content

WORK-IN-PROGRESS - contributing isoscope scheduler #534

WORK-IN-PROGRESS - contributing isoscope scheduler

WORK-IN-PROGRESS - contributing isoscope scheduler #534

Triggered via pull request October 22, 2024 22:03
Status Cancelled
Total duration 2m 58s
Artifacts 3

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test (py38-pytestmin, ubuntu-latest)
Process completed with exit code 1.
test (py38-pytestlatest, ubuntu-latest)
Process completed with exit code 1.
test (py38-pytestmin, windows-latest)
Process completed with exit code 1.
test (py38-pytestlatest, windows-latest)
Process completed with exit code 1.
test (py311-pytestmain, windows-latest)
Canceling since a higher priority waiting request for 'test-refs/pull/1126/merge' exists
test (py311-pytestmain, windows-latest)
The operation was canceled.
test (py313-pytestlatest, windows-latest)
Canceling since a higher priority waiting request for 'test-refs/pull/1126/merge' exists
test (py313-pytestlatest, windows-latest)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
Package Metadata
1.82 KB
Packages
172 KB
PyPI README
598 Bytes