Add September 2024 meeting notes #282
test-build.yaml
on: pull_request
Build with Sphinx
10m 15s
Annotations
2 errors
Build with Sphinx
The job running on runner GitHub Actions 37 has exceeded the maximum execution time of 10 minutes.
|
Build with Sphinx
The operation was canceled.
|