Skip to content

Merge pull request #1275 from supercaracal/fix-cluster-test #797

Merge pull request #1275 from supercaracal/fix-cluster-test

Merge pull request #1275 from supercaracal/fix-cluster-test #797

Triggered via push May 2, 2024 18:34
Status Failure
Total duration 15m 27s
Artifacts

test.yaml

on: push
Matrix: Driver
Matrix: Redis
Matrix: Ruby
Matrix: TruffleRuby
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Ruby (jruby-9.3.6.0)
The job running on runner GitHub Actions 308 has exceeded the maximum execution time of 15 minutes.
Ruby (jruby-9.3.6.0)
The operation was canceled.
TruffleRuby (redis)
The job running on runner GitHub Actions 27 has exceeded the maximum execution time of 15 minutes.
TruffleRuby (redis)
The operation was canceled.